Idaho electrician licensing
The state issues the credential, and the board named below sets the hours, the exam and the renewal rule. Here is how Idaho structures it.
Idaho Division of Occupational and Professional Licenses (DOPL) — Idaho Electrical Board
Each tier, and what it costs you in hours
The single most common reason an application is rejected is a mismatch between the hours you can document and the hours the board counts. Read this column first.
| Tier | Experience requirement | Exam |
|---|---|---|
| Apprentice / trainee | Registered with the Division before starting work. An apprentice works only under the constant on-the-job supervision of a master, journeyman, residential electrician or limited electrical installer. | None at registration. |
| Journeyman electrician | 8,000 hours of apprentice experience plus a four-year sequence of instruction approved by the Division of Career Technical Education, or 16,000 hours of experience without the instruction (IDAPA 24.39.10.100). No more than 2,000 hours earned as a limited installer or trainee counts. | Board-designated examination; a candidate may sit it once the instruction or the 16,000 hours is documented. |
| Master electrician | A master licence does not require holding a journeyman licence first. The master is the supervising electrician who carries responsibility for installations made under the contractor. | Board-designated master examination. |
| Residential electrician / limited electrical installer | Residential: 4,000 hours plus a two-year approved sequence of instruction. Limited installer: 4,000 hours inside one limited category. Both are scoped credentials, not shortcuts to a journeyman licence. | Class-specific board examination. |
Renewal
Three-year licence cycle with continuing education of 16 hours of Idaho Electrical Code training plus 8 hours of code-update, code-related, industry or independent study.
If you are coming from another state
Where a reciprocal agreement exists, a journeyman licence may be issued without testing, provided the licence was obtained by examination in the issuing state and the applicant has not previously failed the Idaho examination. From a state without an agreement, the applicant documents 16,000 hours and sits the Idaho examination.
Ask the board in writing whether your out-of-state hours count, and in what breakdown. A verbal answer from a clerk is not the record you will rely on if an application is denied.
State-specific details worth knowing
Appliance repair, motor winding and communications experience is excluded from the journeyman requirement no matter how many hours it adds up to.
A provisional journeyman licence exists for applicants who have the 16,000 hours but have not passed the examination — and it can be held only under constant supervision.
The contractor licence is tied to a named supervising electrician. When that relationship ends, the contractor must notify the Division within 10 days, and the licence voids within 90 days unless a replacement is qualified.
A licence must be purchased within 90 days of a successful examination; after that the applicant reapplies and re-examines.
Next steps
- Add up your documented hours before you request an application.
- Check what your current tier legally allows.
- Understand what transfers — and what restarts.
- Confirm the current fee and rule on the board page.
This page records what the board publishes. It is not legal advice, and it is not a substitute for the board's current application instructions — fees and hour thresholds change by rule.